Skip to content
Industrial gas equipment & engineering services 176 5129 5771 info@fornryasp.com
CN EN

Contact Us

Tell us the duty point and site conditions — a process engineer will reply within one working day.

Contact details

Talk to a process engineer

Our sales team routes every enquiry to an engineer, so the first reply is technical rather than commercial.

Contact person
Mr. Huang
Email
Sales: sales@fornryasp.com
Address
Room 218, Bldg 7, Yichuang Science Park, No.50 Weixin Rd, Suzhou Industrial Park, Jiangsu, China
Business hours
Mon - Fri, 8:30 - 17:30 (GMT+8)
Emergency support available 24/7 for contracted clients.

Request a quotation

Fill in the duty point below — the more specific, the more useful our first reply.

Submitting opens your mail client with the details filled in — nothing is sent until you press send.

FAQ

Questions we are asked before every project

How long from enquiry to delivery?

PSA stations typically 2–4 months; small to mid-size ASU 6–9 months; large ASU and EPC projects 10–14 months, depending on production slots and approvals.

Do you handle installation and commissioning?

Yes. A resident project manager, process engineer and I&C engineer are included through to on-spec product. Civil works and utilities can be contracted separately with our interface management.

Can we buy spare parts only?

Yes. Common spares are stocked and custom parts are made to drawing. We also offer localization alternatives and life assessment for imported equipment.