Project References

A selection of delivered projects with scope, process parameters and measured outcomes.

30+
Units delivered
12
Industries
2,000
Largest N₂ capacity (Nm³/h)
24h
Response time
References

Selected projects across six industries

Names of end clients are withheld where confidentiality applies; process data and scope are accurate.

20,000 Nm³/h ASU for a Jiangsu steel group
Iron & Steel EPC supply · 2026 · Jiangsu

20,000 Nm³/h ASU for a Jiangsu steel group

ASU supporting blast-furnace oxygen enrichment, 99.6% O₂ with 8,000 Nm³/h nitrogen export, delivered as a skid-mounted cold box.

PSA nitrogen station for an Anhui PV materials maker
PV & New Energy Equipment supply · 2026 · Anhui

PSA nitrogen station for an Anhui PV materials maker

Two 1,200 Nm³/h trains at 99.999% purity replacing purchased liquid nitrogen, cutting annual gas cost by 46%.

LNG vaporization station in a Shandong chemical park
Petrochemical Turnkey EPC · 2025 · Shandong

LNG vaporization station in a Shandong chemical park

Two 100 m³ tanks with 6,000 Nm³/h vaporization, dual-train auto changeover for continuous park supply and peak shaving.

Specialty gas purification for a Zhejiang semiconductor fab
Semiconductor Process package + commissioning · 2026 · Zhejiang

Specialty gas purification for a Zhejiang semiconductor fab

Helium recovery and purification at 94% recovery and 99.9995% purity, saving roughly CNY 3.2 million a year in helium purchases.

VPSA oxygen plant for a Guangdong non-ferrous smelter
Non-ferrous Metals Equipment supply · 2025 · Guangdong

VPSA oxygen plant for a Guangdong non-ferrous smelter

A 3,000 Nm³/h VPSA unit for copper smelting oxygen enrichment, cutting power cost per unit of oxygen by 38% versus vaporized liquid oxygen.

Oxy-fuel retrofit for a Hebei glass furnace
Glass & Building Materials Retrofit project · 2025 · Hebei

Oxy-fuel retrofit for a Hebei glass furnace

Oxygen generation and oxy-fuel systems for two float-glass lines, cutting energy per ton of glass by 11% and NOx emissions by 30%.