About Fornry
An engineering-led supplier of industrial gas equipment, headquartered in Suzhou, China.
Built by engineers, run to engineering standards
Suzhou Fornry Energy Equipment Co., Ltd. was registered in Suzhou Industrial Park in May 2025. We supply industrial gas equipment and deliver engineering services, covering cryogenic air separation, PSA oxygen and nitrogen generation, natural gas processing and liquefaction, cryogenic storage and vaporization, plus gas purification and recovery.
Unlike a pure trading company, every proposal we issue is reviewed by process engineers. Before recommending a configuration we model your gas demand curve, purity requirement, power price and site constraints, then compare on-site generation against purchased liquid gas on a full lifecycle basis.
Our manufacturing partners hold the fabrication and testing capability; we own the process selection, quality surveillance, delivery schedule and after-sales accountability. That division keeps cost competitive without giving up engineering control.

Three commitments we do not trade away
Engineering rigour
Every proposal is process-checked and safety-reviewed. We never sign first and engineer later.
Transparency
Energy, capex and payback are modelled honestly — no hidden running costs, no inflated savings.
Responsiveness
Technical enquiries answered within 24 hours; emergency on-site response within 48 hours in the Yangtze Delta.
From field service to integrated supply
The company grew out of field work: commissioning, troubleshooting and overhauling plants that other suppliers had already delivered. That experience still shapes how we specify equipment today.
Suzhou Fornry Energy Equipment was registered in Suzhou Industrial Park, supplying gas separation equipment alongside installation and engineering services.
Took on its first design commissions for nitrogen and oxygen units, building end-to-end delivery from process calculation to construction drawings.
Expanded into equipment supply, commissioning and O&M services, with the bilingual website launched.
How we keep delivered equipment honest
Quality management
Supply chain and inspection run to ISO 9001 principles: incoming inspection, in-process witnessing and factory test reports delivered with the equipment.
Safety & environment
Any scope involving flammable media or pressure vessels goes through mandatory HAZOP review and safety interlock design checks.
Supply chain
An approved-vendor list with OEM certificates and third-party test reports retained for critical components.
Tell us your gas demand, we handle the rest
Share your capacity, purity and site conditions. We respond with a technical proposal and budget estimate within two working days.