
Iron & Steel
SUZHOU FORNRY · CRYOGENIC GAS EQUIPMENT
Air separation, PSA generation, natural gas liquefaction and cryogenic storage — supplied and serviced from feasibility study to start-up.
ExploreSix product lines cover gas generation, liquefaction, storage and recovery. Each can be supplied as equipment, as a packaged station, or as a turnkey EPC scope.

Integrated oxygen, nitrogen & argon solutions
View details
On-demand gas at lower capex and energy cost
View details
Full-chain purification and liquefaction, wellhead to terminal
View details
LOX / LIN / LAR / LNG storage and supply packages
View details
Turning emissions into reusable feedstock
View details
OEM-grade spares that shorten downtime
View details
Founded by engineers who spent years commissioning air separation plants, Fornry understands that a reliable gas supply depends as much on selection, installation and maintenance as on the equipment itself.
Headquartered in Suzhou, we work with qualified manufacturing partners across China and serve clients in metallurgy, chemicals, semiconductors, new energy and healthcare.
Equipment is the starting point. Our engineers stay involved through installation, commissioning, operation and the retrofit that follows a decade of service.
Starting from your gas demand curve, purity requirements, site conditions and capex ceiling, we compare processes, size the equipment and deliver feasibility plus payback analysis.
PFD, P&ID, equipment layout, piping stress and control philosophy, coordinated with design institutes through construction drawings and safety review.
Resident project managers plus process and I&C engineers handle erection, piping, solo runs, integrated testing and handover to on-spec product.
Live data feeds into our monitoring platform for energy analysis, fault alerts and annual maintenance planning, with optional fully outsourced O&M.
Capacity expansion, purity upgrade, energy diagnosis and control-system renewal for aging ASU and PSA plants, typically paid back in 12 – 18 months.
Customer-specific spare lists and safety stock, plus operator, maintenance and emergency-drill training with standardized work procedures.
A selection of recent projects across steel, chemicals, semiconductors and new energy.



Our bilingual website is live, presenting the full product matrix, service capabilities and project references.
The two sides will jointly develop and engineer ASU process optimization and waste-pressure/heat recovery.
Share your capacity, purity and site conditions. We respond with a technical proposal and budget estimate within two working days.